Case Studies
Park House School
MF ceilings and Rockfon Artic ceilings installed to library extension, to include light lantern design with random design Rigitone boards.
Stud partition walls installed to internal walls and SFS to external walls, with a taped joint finish.
Wedding Barn -Donnigton Valley
MF ceilings 1-2 & Owa plank ceilings installed to Corridors.
MF British Gypsum ceilings installed with a Echophon Matrix installed in the bar & servery area. This was the first installation of this matrix system in the UK.
The Willink School
New 2 storey building constructed of classrooms, corridors, toilets, lobbies and stairwells.
Drylined & insulated both floors to the perimeters
Installed metal stud & track walls to form all areas on both floors.
Installation of Rockfon Artic acoustic ceiling system 600x600 tiles to all areas.
Metal stud form work to staircases.
Created new areas with installation of metal stud walls, tape and joint finish and Armstrong Zantia & Rockfon ceiling systems
Walled Garden Henley
Insulated in between rafters, foil tapped, cladded the ceilings with a thermal line super board and applied a plaster skim finish.
Royal Berkshire Hospital
Carried out a clean room ceiling sealed to grid work in the RBH intensive care unit.
London Borough of Ealing
Warehouse area converted into office and toilet facilities.
Highdown leisure centre
Removal of ceilings and installation of Rockfon ceiling in swimming pool and changing areas.
Mary Hare School
Installation of ayin acoustic ceiling tiles laid in a white 24 mm grid system
Sonic Laboratories
Full Office Refurbishment
New Kitchen-Satin Spa
Installation of British gypsum ceiling
Smart Homes Partnership
Construction of Walls & Ceilings (currently in progress)
Full Refurbishment of Park Home
Construction of Sauna & Spa Area
Kitchen & Dining Area Refurbishment
Garage Conversion
Conversion to storage area & office
Full House Refurbishment
Garage Refurbishment
Rebuild, extension and installation of electric doors
Construction of External Salon